... storage plant , the unit output of a pumped - storage scheme is usually not more than 70 per cent . of the unit input . This means that the fuel cost per unit of output is at least 1-43 times the fuel cost per unit of input . The other ...
... storage plant , the unit output of a pumped - storage scheme is usually not more than 70 per cent . of the unit input . This means that the fuel cost per unit of output is at least 1-43 times the fuel cost per unit of input . The other ...
Page 13
... storage tanks from which the spirit was being taken . By an unfortunate chance a valve had been left open connecting the main storage tanks to some smaller intermediate tanks and on opening the valve to the main tanks petroleum spirit ...
... storage tanks from which the spirit was being taken . By an unfortunate chance a valve had been left open connecting the main storage tanks to some smaller intermediate tanks and on opening the valve to the main tanks petroleum spirit ...
Page 18
... storage for a period less than 3 months . 4.13 . It was also agreed to be desirable that ( a ) the time of completion of the quick - freezing process should be identified with the attainment of the particular temperature at which the ...
... storage for a period less than 3 months . 4.13 . It was also agreed to be desirable that ( a ) the time of completion of the quick - freezing process should be identified with the attainment of the particular temperature at which the ...
Contents
TABLE II | 18 |
1957 | 27 |
Balance Sheet as at 31st December 1962 37 | 37 |
35 other sections not shown
Other editions - View all
Common terms and phrases
31st December Aberdeen accidents amount annual Appendix assets Authority average cable capital cost cent circuit coal Cockenzie Committee compared compartment tank connection construction consumers continued conventional thermal Council Councillor Cruachan Depreciation diesel distribution Dundee economic Electricity Board engineering estimated expenditure explosion Factories Act Fatal Total Fatal figures Fire Brigade Fire Service firedamp Fisheries fuel cost Glasgow haemoglobin hydro-electric ignition increase industry Inspectors installation interest Kilmorack kilowatts Kippering Loans Loch manufacture maximum demand meter million units National Coal Board North Board North of Scotland nuclear Officer organisation output capacity overhead lines paragraph plant load factor power station premises production costs programme pumping Report result return gate revenue safety Scotland District Scotland Electricity Scottish South South of Scotland storage Stornoway substations Tariff thermal efficiency thermal plant Total Fatal Total transmission trawlers vessels voltage volts white fish