Parliamentary Papers, Volume 17H.M. Stationery Office, 1962 - Bills, Legislative |
From inside the book
Results 1-3 of 99
Page 40
... hydro - electric production costs per unit at different plant load factors . Comparative costs of conventional thermal and hydro generation 112. Turning now to the comparative costs of generation , and taking Scotland as a whole , we ...
... hydro - electric production costs per unit at different plant load factors . Comparative costs of conventional thermal and hydro generation 112. Turning now to the comparative costs of generation , and taking Scotland as a whole , we ...
Page 105
... hydro generation costs Adjustments to hydro production costs 1. In paragraph 117 reference was made to the need , when making a comparison between hydro and alternative thermal production costs , not only to ensure that the proposed hydro ...
... hydro generation costs Adjustments to hydro production costs 1. In paragraph 117 reference was made to the need , when making a comparison between hydro and alternative thermal production costs , not only to ensure that the proposed hydro ...
Page 106
... hydro as far as balancing units are concerned . If the hydro load factor is lower than the average plant load factor during the life of the alternative thermal plant , there is a net debit of balancing units to the hydro . This ...
... hydro as far as balancing units are concerned . If the hydro load factor is lower than the average plant load factor during the life of the alternative thermal plant , there is a net debit of balancing units to the hydro . This ...
Contents
TABLE II | 18 |
1957 | 27 |
Balance Sheet as at 31st December 1962 37 | 37 |
35 other sections not shown
Other editions - View all
Common terms and phrases
31st December Aberdeen accidents amount annual Appendix assets Authority average cable capital cost cent circuit coal Cockenzie Committee compared compartment tank connection construction consumers continued conventional thermal Council Councillor Cruachan Depreciation diesel distribution Dundee economic Electricity Board engineering estimated expenditure explosion Factories Act Fatal Total Fatal figures Fire Brigade Fire Service firedamp Fisheries fuel cost Glasgow haemoglobin hydro-electric ignition increase industry Inspectors installation interest Kilmorack kilowatts Kippering Loans Loch manufacture maximum demand meter million units National Coal Board North Board North of Scotland nuclear Officer organisation output capacity overhead lines paragraph plant load factor power station premises production costs programme pumping Report result return gate revenue safety Scotland District Scotland Electricity Scottish South South of Scotland storage Stornoway substations Tariff thermal efficiency thermal plant Total Fatal Total transmission trawlers vessels voltage volts white fish