Parliamentary Papers, Volume 17H.M. Stationery Office, 1962 - Bills, Legislative |
From inside the book
Results 1-3 of 74
Page 76
... further generating plant with an output capacity of about 3,000 MW will have to be authorised , and that by 1980 a still further 2,000 MW of plant will be required , together with replacement capacity for the plant to be retired between ...
... further generating plant with an output capacity of about 3,000 MW will have to be authorised , and that by 1980 a still further 2,000 MW of plant will be required , together with replacement capacity for the plant to be retired between ...
Page 110
... further 5 MW of firm power to be generated at Gaur , and a further 10 million units to be generated at the four stations mentioned , using water that at present spills over the dams . The effective gain therefore is 9.98 MW capacity and ...
... further 5 MW of firm power to be generated at Gaur , and a further 10 million units to be generated at the four stations mentioned , using water that at present spills over the dams . The effective gain therefore is 9.98 MW capacity and ...
Page 39
... further 10 sites for outdoor , indoor and underground substations are in process of negotiation . Three primary substations were changed over to 33 kV . and transformer capacity increased in a further three . Two primary substation ...
... further 10 sites for outdoor , indoor and underground substations are in process of negotiation . Three primary substations were changed over to 33 kV . and transformer capacity increased in a further three . Two primary substation ...
Contents
TABLE II | 18 |
1957 | 27 |
Balance Sheet as at 31st December 1962 37 | 37 |
35 other sections not shown
Other editions - View all
Common terms and phrases
31st December Aberdeen accidents amount annual Appendix assets Authority average cable capital cost cent circuit coal Cockenzie Committee compared compartment tank connection construction consumers continued conventional thermal Council Councillor Cruachan Depreciation diesel distribution Dundee economic Electricity Board engineering estimated expenditure explosion Factories Act Fatal Total Fatal figures Fire Brigade Fire Service firedamp Fisheries fuel cost Glasgow haemoglobin hydro-electric ignition increase industry Inspectors installation interest Kilmorack kilowatts Kippering Loans Loch manufacture maximum demand meter million units National Coal Board North Board North of Scotland nuclear Officer organisation output capacity overhead lines paragraph plant load factor power station premises production costs programme pumping Report result return gate revenue safety Scotland District Scotland Electricity Scottish South South of Scotland storage Stornoway substations Tariff thermal efficiency thermal plant Total Fatal Total transmission trawlers vessels voltage volts white fish