Report of the Chief of Engineers U.S. ArmyU.S. Government Printing Office, 1869 |
From inside the book
Results 1-5 of 77
Page 7
... height as for the rest of the counterscarp of the main work . At the foot of the glacis an open ditch for drainage has been constructed and sodded . The gap left in the scarp of the main work for communication has been appro- priately ...
... height as for the rest of the counterscarp of the main work . At the foot of the glacis an open ditch for drainage has been constructed and sodded . The gap left in the scarp of the main work for communication has been appro- priately ...
Page 8
... height of 39.78 ; the adjoining pier completed ; the south end of parade wall of curtain III raised to 39.58 , and that of the west end of curtain II to 38.33 . The last main arch and drain of curtain III and the remaining two of ...
... height of 39.78 ; the adjoining pier completed ; the south end of parade wall of curtain III raised to 39.58 , and that of the west end of curtain II to 38.33 . The last main arch and drain of curtain III and the remaining two of ...
Page 10
... height wall , will be completed during the present work- ing season . It is proposed to construct a sea - wall to protect the bluff in front of the east battery , and to arrange the covered ways of the keep for the reception of a ...
... height wall , will be completed during the present work- ing season . It is proposed to construct a sea - wall to protect the bluff in front of the east battery , and to arrange the covered ways of the keep for the reception of a ...
Page 15
... height of four feet six inches above the level of the parade of the fort . It is proposed to continue the operations of the well as long as a reasonable prospect exists of reaching pure water within a REPORT OF CHIEF OF ENGINEERS . 15.
... height of four feet six inches above the level of the parade of the fort . It is proposed to continue the operations of the well as long as a reasonable prospect exists of reaching pure water within a REPORT OF CHIEF OF ENGINEERS . 15.
Page 46
... height as will set the water back to a depth sufficient to flood all the bars at low water without dredging be- tween the dam and the town of Utica . To lessen the height of the second dam contemplated near the mouth of Copperas Creek ...
... height as will set the water back to a depth sufficient to flood all the bars at low water without dredging be- tween the dam and the town of Utica . To lessen the height of the second dam contemplated near the mouth of Copperas Creek ...
Other editions - View all
Common terms and phrases
A. A. HUMPHREYS allotted boats bottom breakwater Brevet Brevet Brigadier Brevet Colonel Brevet Major bridge brigadier general United canal Captain cents per cubic channel charge Chief of Engineers colonel United commenced completed construction contract contractors Corps of Engineers cost Creek cribs cubic yards depth of water dike dredging drill ending June 30 estimate excavation expended feet wide fiscal year ending flood Grand Haven harbor high water hundred feet improvement inches Island Keokuk Lake levees Lieutenant Colonel lieutenant colonel United lock low water Major of Engineers March mean miles Mississippi Mississippi River mouth navigation necessary Number obedient servant obstructions Ohio operations piles present proposed removed repairs respectfully riprap river rock sand season Shoals shore snag-boats snags steamer stone submitted surface survey timber tion Total United States Army UNITED STATES ENGINEER velocity vessels Washington Washington aqueduct Wheeling Island width Willamette River
Popular passages
Page 405 - not to obstruct, impair, or injuriously modify the navigation of the river,' was prepared by myself, and with reference to the meaning attached to those words by the best authorities, and they were, I believe, used in the act with that understanding of them. I would further recommend that the bridge company be furnished with a copy of the report of the commission. " Very respectfully, your o'bedient servant. "AA HUMPHREYS, " Brigadier- General and Chief of Engineers. "Hon.
Page 521 - ... than thirty-five feet ; that a space or spaces not exceeding in all one thousand six hundred and sixty feet of the shoal or shoals, over which the present bridge passes, may be filled up by a solid embankment, in parts if convenient, of earth obtained by dredging the river channel.
Page 397 - An Act providing that the bridge in the course of construction over the East River, between the cities of New York and Brooklyn, by the New York Bridge Company, shall be a public work of the cities of New York and Brooklyn, and for the dissolution of said Company, and the completion and management of the said bridge by the said cities.
Page 520 - An Act providing for the purchase by the United States of the rights of the Washington Bridge company, in the District of Columbia, and for the erection of a public bridge on the site thereof.
Page 404 - An Act to incorporate the New York Bridge Company, for the purpose of constructing and maintaining a bridge over the East River, between the cities of New York and Brooklyn.
Page 309 - And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river, the cause may be tried before the district court of the United States of any State in which any portion of said obstruction or bridge touches.
Page 524 - An act making appropriations for the support of the Army for the fiscal year ending June 30, 1868 and for other purposes...
Page 309 - And prodded also, That said draw shall be opened promptly, upon reasonable signal, for the passage of boats whose construction shall not be such as to admit of their passage under the...
Page 465 - Sir: I have the honor to report that in compliance with your instructions I...
Page 404 - Be it enacted by the Senate and, House of Representatives of tJie United States of America in Congress assembled, That...