Page images
PDF
EPUB

Instructions: (1) For purposes of this schedule, the track categories are defined as follows:

Track Category

A-20 million or more gross ton-miles per mile per year (including track over which passenger service is provided-see Category F).

B-Less than 20 million gross ton-miles per mile per year but at least 5 million (does not include track over which passenger service is provided-see Category F). C-Less than 5 million gross ton-miles per mile per year but at least 1 million (does not include track over which passenger service is provided-see Category F). D-Less than 1 million gross ton-miles per mile per year (does not include track over which passenger service is provided-see Category F).

E-Way and yard switching tracks (passing tracks, crossovers and turnouts shall be included in appropriate Category A, B, C, D, F, and Potential Abandonments, as appropriate.)

F-Track over which any passenger service is provided (other than potential abandonments); however, if annual traffic density is greater than 20 million gross tonmiles per mile per year, the track shall be included in Track Category A.

Potential Abandonments

Route segments identified by railroads as potentially subject to abandonment as required by Section 1a(5)(a) of the Interstate Commerce Act.

(2) This schedule shall only include those lines maintained by the reporting carrier. It shall not include track maintained by others over which the reporting carrier has trackage rights.

(3) If, for two consecutive years, a line segment classified in one track category maintains a traffic density which would place it in another, it shall be reclassified into that category as of the beginning of the second year.

(4) Average speed reduction per slow order mile shall be based on reductions from the maximum authorized timetable train speeds.

(5) Miles under slow order shall not include those due to ongoing maintenance, or other temporary track conditions such as floods or derailments.

357 I.C.C.

[blocks in formation]

Schedule $13 (A) ties laid in replacement

Number of ties laid in replacement
New ties
Treated Untreated

Wooden

Concrete Other

Second-hand ties Wooden

Other Total

Treated Untreated

[blocks in formation]
[blocks in formation]

Note: The term "spot maintenance" means repairs to track components during routine inspections, as opposed to programmed replacements aimed at upgrading the general condition of the tracks. "% of Spot Maintenance" refers to the percentage of total ties laid in replacement considered to be spot maintenance. Please refer to Schedule 512 for explanation of line segments to be included in this schedule, and for definition of track categories.

A

Schedule 515 (A) Rails laid in replacement

Miles of rail laid in replacement (rail-miles)

[blocks in formation]
[blocks in formation]

Relay Rail Welded rail

Bolted rail

[blocks in formation]

Remarks

Note: Please refer to Schedule 512 for explanation of line segments to be included in this schedule, and for definition of track categories. Please refer to Schedule 513 (A) for the definition of "spot maintenance.

[ocr errors]
[blocks in formation]

Instruction: In columns with the heading "%" give the percentage of replacements to total units of property at year-end.

Note: Please refer to schedule 512 for explanation of line segments to be included in this schedule, and for definition of track categories.

[blocks in formation]

(1) Report in appropriate columns total numbers of replacements for all categories of track lines and the percentage of replacements to the units of property.

(2) Explain in "Remarks" changes in track mileage due to acquisition, mergers, major abandonments and other disposals.

Note: Please refer to Schedule 512 for explanation of line segments to be included in this schedule.

(9th preceding)

« PreviousContinue »