Report of the Chief of Engineers U.S. Army, Part 4U.S. Government Printing Office, 1888 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 2194
... completed , the works have accomplished their purpose of holding the bank and preventing caving , although no marked deposit is ob- served . Preparations have been made for the authorized extension of the protection and work will begin ...
... completed , the works have accomplished their purpose of holding the bank and preventing caving , although no marked deposit is ob- served . Preparations have been made for the authorized extension of the protection and work will begin ...
Page 2203
... completed and to all appearances entirely successful , a résumé of its history seems appropriate . Prior to 1873 the portion of the rive bank constituting the harbor front of Memphis was compara- tively stable . In 1876 it had receded ...
... completed and to all appearances entirely successful , a résumé of its history seems appropriate . Prior to 1873 the portion of the rive bank constituting the harbor front of Memphis was compara- tively stable . In 1876 it had receded ...
Page 2205
... completed work less than $ 24 per foot . This is the heaviest and most costly work of its kind ever put down , and it will certainly protect any alluvial bank on the Mississippi River , no matter how difficult . These figures , from ...
... completed work less than $ 24 per foot . This is the heaviest and most costly work of its kind ever put down , and it will certainly protect any alluvial bank on the Mississippi River , no matter how difficult . These figures , from ...
Page 2207
... . Contracts have been made with the parties named , and the line will be completed by February 15 , 1888 , CITIZENS ' BLUFF PROTECTION . This is practically a continuation APPENDIX U U - REPORT OF MISSISSIPPI RIVER COMMISSION . 2207.
... . Contracts have been made with the parties named , and the line will be completed by February 15 , 1888 , CITIZENS ' BLUFF PROTECTION . This is practically a continuation APPENDIX U U - REPORT OF MISSISSIPPI RIVER COMMISSION . 2207.
Page 2214
... completed , so far as the field work is concerned , while the preparation of the maps for publication is still to be finished and the surveys on the Upper Mississippi have been only partially executed . During the past year no field ...
... completed , so far as the field work is concerned , while the preparation of the maps for publication is still to be finished and the surveys on the Upper Mississippi have been only partially executed . During the past year no field ...
Contents
2191 | |
2192 | |
2213 | |
2215 | |
2251 | |
2270 | |
2282 | |
2313 | |
2621 | |
2628 | |
2642 | |
2659 | |
2687 | |
2749 | |
2754 | |
2766 | |
2316 | |
2320 | |
2334 | |
2345 | |
2357 | |
2371 | |
2378 | |
2391 | |
2404 | |
2430 | |
2451 | |
2525 | |
2532 | |
2543 | |
2769 | |
2803 | |
2804 | |
2810 | |
2816 | |
2828 | |
2911 | |
2919 | |
1 | |
3 | |
4 | |
5 | |
6 | |
9 | |
Other editions - View all
Common terms and phrases
approved Board boats Bridge Company channel channel-span channel-way Chief of Engineers City commenced Continuing improvement corporation Corps of Engineers cost cottonwood Creek dike district draw draw-bridge draw-openings draw-span east ENGINEER OFFICE erected expense feet from river free and safe gauge Headquarters Corps hereby high water high-water hundred Improving harbor indorsement Island July June 30 Lake Landing left bank levee Lieut low water Memphis meters miles Mississippi River Mississippi River Commission Missouri River mouth obedient servant obstruction Ohio Connecting Railway Ohio River opening passage piers plan and location proposed bridge railroad bridge Railroad Company Railway Company repairs respectfully revetment right bank river and harbor River Commission road Saint Louis Secretary Secretary of War side spans stone structure submit Tenn Tennessee River thereof thousand dollars tion tows U. S. ARMY United States Army UNITED STATES ENGINEER Washington water-way width
Popular passages
Page 2835 - ... at all stages, and the soundings, accurately showing the bed of the stream, the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject ; and until the said plan and location of the bridge are...
Page 2859 - ... security of navigation of said river as the Secretary of War shall prescribe; and to scenic that object the said company or corporation shall submit to the Secretary of War, for his examination and approval, a design and drawings of the bridge, and a map of the location, giving...
Page 2826 - That any bridge constructed under this act, and according to its limitations, shall be a lawful structure, and shall be recognized and known as a post-route, upon which, also, no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States than the rate per mile paid for the transportation over the railroads or public highways leading to said bridge...
Page 2839 - And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river...
Page 2897 - That any bridge built in accordance with the provisions of this Act shall be a lawful structure and shall be recognized and known as a post route, upon which no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States than the rate per mile paid for the transportation over any railroad, street railway, or public highway leading to said bridge...
Page 2927 - STATE. — The foregoing act having been presented to the President of the United States for his approval, and not having been returned by him to the house of Congress in which it originated within the time prescribed by the Constitution of the United States, has become a law without his approval.] Fob.
Page 2848 - Either party being dissatisfied with the finding of the referees shall have the right, within ninety days after the making of the award and notice of the same, to appeal by original petition to the United States...
Page 2727 - An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes...
Page 2890 - ... shall conform in using said bridge, all matters at issue between them shall be decided by the Secretary of War, upon a hearing of the allegations and proofs of...
Page 2869 - War ; and in case of any litigation arising from any obstruction or alleged obstruction to navigation created by the construction of any bridge under this Act.