Attention is invited to the diagram marked (B), submitted herewith, which, with the preceding table, clearly shows the lines proposed.

The following tables will show how the various wires are to be used in the more important buildings:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

* The "House" Exchange will also have 2 wires over to the “Senato" Exchange.

NATIONAL MUSEUM.

12

Six telegraph circuits.....
Telephone wires to-

State, War, and Navy Building.
Executive Mansion.
Treasury Department
Office of Attorney-General.
Interior Department.
Post-Oflice Department.
Pension Office..
Government Printing Office

23

Telonhone wires to-Continued.

1
1
1
1
2 11
1
1

United States Senate
House of Representatives

Total
Branch lines from National Moseum :

Armory
Army Medical Masenn.
Smithsonian Institution
Agricultural Department..

5 6 10 9

The estimated cost of the whole work, based upon present prices of labor and materials, will be about as follows: 57,644 feet of trenching and boxing, including filling with pitch, at 22 cents per foot .....

$12, 681.63 1,001,905 feet of conductor at 44 cents per foot delivered in Washington.. 45, 085. 72 Supervising laging cable, expert joiners, electrician, etc., for 1,001,905 feet conductor, at } cent per foot.....

5, 009.52 Total ...

62,776.92 Add 10 per cent. for approximate cost of taking cables into buildings, and contingencies

6, 277.69

Grand total...

69, 054.61

It will be observed that in this estimate I have carried out literally the terms of the resolution and confined my estimates to the underground wires for telegraph and telephone service, but carrying them into the operating rooms in the various buildings.

The cost of the few telegraph instruments and the eight switch-boards which will be required will be about $1,000; the expense of the telephones will be a matter of more importance, and will depend entirely upon the number of instruments that may be required in each department.

The president of the Chesapeake and Potomac Telephone Company informs me that his company has no authority to sell telephones, but will rent them at the rate of $20 per set per annum, each set consisting of one hand telephone and one transmitter. I have been told that in case the instruments can be purchased they will cost about $40 per set. I am, general, very respectfully, your obedient servant,

JOHN M. WILSON,
Lieut. Col. of Engineers,

Colonel U. S. Army. The CHIEF OF ENGINEERS, U. S. A.

Z Z 3.

WASHINGTON MONUMENT.

OFFICE OF PUBLIC BUILDINGS AND GROUNDS,

Washington, D. C., October 4, 1888. GENERAL: I have the honor to submit the following report of opera. tions upon the completion of the Washington Monument up to the close of the month of September, 1888.

By direction of the President of the United States, as contained in Special Orders, No. 76, Headquarters Army, Adjutant-General's Office, Washington D. C., April 3, 1888, I reported to the Joint Commission for the Completion of the Washington Monument, on April 4, 1888, as engineer in charge of the construction of the monument, vice Col. Thos. Lincoln Casey, Corps of Engineers, relieved at his own request.

The last report made by my predecessor to the Commission was dated December 1, 1887, and submitted to Congress on December 17, 1887.

Under the terms of the act of Congress approved October 2, 1888, known as the sundry civiļ bill, the joint commission created by the

act of August 2, 1876, for the completion of the Washington Monument was dissolved at its own request, and tho Secretary of War was charged with the custody, care, and protection of the monument.

Since December 1, 1887, operations have been in progress under contract with Mr. Thomas H. Lyons, of Baltimore, constructing an earthen embankment around the monument; during this period he has deposited about 120,000 cubic yards of earth in position, making in all about 205,000 cubic yards deposited under his contract.

The total amount that will be contained in the mound when com. pleted has been determined by accurate calculation to be 267,412 cubic yards, of which 250,000 yards are to be furnished by Mr. Lyons under his contract. Careful instrumental surveys have been made from time to time in order to accurately determine the quantities of earth in position delivered by the contractor.

The steam macbinery and the electric light plant have been put in running order, and under the terms of the act of Uctober 2, 1888 (suu. dry civil bill), the elevator and machinery connected therewith will be started at an early day.

On the 18th of February, 1888, proposals were invited for the construction, at the expense of the Washington Monument Society, of a marble lodge house, to be situated about 40 feet from the monument. The contract was awarded to Messrs. Lane & Malnati, of this city, for the sum of $10,7:20. The location was afterwards changed by direction of the Monument Commission io a position about 480 feet east of the monument, and for the necessary work connected with this change an additional sum of $930 was allowed the contractors by the Commission.

Cperations were commenced early in April at the original site selected, but suspended in May and again resumed early in June at the new site. The progress of the work has been slow but the character of the materials and construction bas been satisfactory. At the close of September, 1888, the walls of the building were nearly completed.

During the present fiscal year it is proposed to finish the construction of the terrace under contract, to cover its entire area with good soil, to seed it down, to commence laying out roads and walks, to com. plete the new lodge, to begin a system of drainage for the grounds, to insert in the walls of the monument the memorial stones on hand, and to maintain in good order the machinery connected with tbe elevator and electric lights.

The following estimate for operating the elevator, the electric lights, and machinery connected therewith, for the fiscal year ending June 30, 1890, is submitted :

One custodian, at $100 per month...
One steam engineer, at $50 per month
One assistant steam engineer, at $60 per month
One fireman, at $50 per month...
One assistant fireman, at $45 per inonth..
One conductor of elevator car, at $75 per month.
One attendant on floor, at $45 per month
One attendant on top floor, at $45 per month...
Three night and day watchmen, at $60 per month..
Fuel, lights, oil, waste, packing, tools, matches, paints, brushes, brooms,

lanterns, rope, nails, screws, lead, electric lights, heating apparatus, oil
stoves for elevator car and upper and lower floor, repairs to engines, boil-
ers, dynamo, elevator, and repairs of all kinds connected with the monu-
ment and machinery, and purchase of all necessary articles for keeping
the monument, machinery, elevator, and electric light plant in good order..

$1,200

960 720 600 540 900 640

540 2, 160

2, 340

10,500

An estimate for continuing the improvement of the grounds around the monument has been submitted in my report upon Public Buildings and Grounds for the last fiscal year.

Statement of expenditures from December 1, 1887, to September 30, 1828. Balance on hand December 1, 1887

$74, 9:27. 61 Appropriation of October 2, 1888.

27,500.00 Total.....

102, 427.61 Amount expended up to September 30, 1888

$44, 853, 02 Amount covered by existing contracts..

30,074. 59

74, 927. 61 Amount available October 2, 1883.

... 27,500.00 Very respectfully, your obedient servant,

JOHN M. WILSON, Lieut. Col. Corps of Engineers,

Colonel U. S. Army. The CHIEF OF ENGINEERS, U. S. A.

ENG 88—176