Hidden fields
Books Books
" Hillsboro liiver to the city of Tampa, and the formation of a channel 200 feet wide and 20 feet deep at mean low water from the outer bar to Port Tampa. "
Report of the Chief of Engineers U.S. Army - Page 1675
by United States. Army. Corps of Engineers - 1893
Full view - About this book

Annual Reports of the War Department, Part 2

United States. War Department - 1911 - 1172 pages
...and from 50 to 300 feet wide. The project adopted June 8, 1896, provided for obtaining, by dredging, a channel ‘200 feet wide and 20 feet deep at mean low water for a distance of about 1 mile from deep water in Norfolk Harbor. The estimated cost was $45,000, all...
Full view - About this book

House Documents, Otherwise Publ. as Executive Documents ..., Volume 2, Part 2

United States. Congress. House - United States - 1872 - 1094 pages
...477, 429 30 Total coat of ranal 10,305,73112 This sum represents only the cost of constructing a canal 200 feet, wide and 20 feet •deep at mean low water from Ship Island Harbor to within one mile of Mississippi City, as proposed by the harbor company. There...
Full view - About this book

Annual Report of the Chief of Engineers to the Secretary of War for ..., Part 2

United States. Army. Corps of Engineers - Engineering - 1892 - 1034 pages
...changed. It now contemplates the formatiuu of a channel 8 feet deep in Hillsboro Bay and Hillsboro River to the city of Tampa, and the formation of a channel...estimated cost of the revised project was $60,000. Two approetions have been made in the acts of 1888 and 1890, aggregating ,000. OPERATIONS PRIOR TO JUNE...
Full view - About this book

Annual Reports of the War Department, Part 2

United States. War Department - 1893 - 892 pages
...contemplates the formation of a channel 8 feet deep in Hillsboro Bay and tlillsboro Kiver to the <-ity of Tampa, and the formation of a channel 200 feet wide and 20 feet at mean low water from the outer bar to Port Tampa. The estimated cost of the revised project was $00,000....
Full view - About this book

Annual Reports of the War Department, Part 1

United States. War Department - 1894 - 906 pages
...provide for a channel 8 feet deep in Hillsboro Bay and Ilillsboro Hiver to the city of Tampa, anda channel 200 feet wide and 20 feet deep at mean low water from the gulf to Port Tampa, a town situated near the mouth of old Tampa Bay and about 9i miles from Tampa....
Full view - About this book

Analytical and Topical Index to the Reports of the Chief of Engineers and ...

United States. Army. Corps of Engineers - Engineering - 1895 - 544 pages
...for the formation and Maintenance of a channel 8 feet deep in Hillsborough Bay and Hillsborough River to the city of Tampa, and the formation of a channel...deep at mean low water from the outer bar to Port Ташра; estimated cost, $60,000, '90, 1605; '92, 1387. Surveys. MAP». '88, 1112. TAMPA BAY ANB...
Full view - About this book

Analytical and Topical Index to the Reports of the Chief of Engineers and ...

United States. Army. Corps of Engineers - 1895 - 544 pages
...Capt. Black, 1889, for Improvement of the waterway connecting Tampa and Old Tampa baye by excavation of a channel 200 feet wide and 20 feet deep at mean low water across the bars, '89, 1309. Surveys. Examination ordered by act of August 11, 1888. Made, 1889, under...
Full view - About this book

Congressional Serial Set, Issue 4444

United States - 1902 - 1084 pages
...at mean low water, and 50 to 300 feet wide. The adopted project provided for obtaining, by dredging, a channel 200 feet wide and 20 feet deep at mean low water from deep water in Norfolk Harbor for a distance of about 1 mile, at an estimated cost of §45,000. This...
Full view - About this book

Annual Report (or Report) of the Secretary of War, Volume 9, Part 1

United States. War Department - 1903 - 1162 pages
...to dredging a 9-foot channel to Tampa under project adopted in 1880. In 1888 provision was made for a channel 200 feet wide and 20 feet deep at mean low water from the Gulf to Port Tampa. This was completed May 12, 1892. On these projects the sum of $130,000 was...
Full view - About this book

Congressional Serial Set, Issue 4946

United States - 1906 - 1308 pages
...low water and 50 to 300 feet wide. The project adopted in 1896 provided for obtaining, by dredging, channel 200 feet wide and 20 feet deep at mean low water from ?ep water in Norfolk Harbor for a distance of about 1 mile, at an timated cost of $45,000. Up to June...
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search
  4. Download EPUB
  5. Download PDF