Annual Reports of the War Department, Volume 2, Part 1

Front Cover
U.S. Government Printing Office, 1890
 

Contents

IN CHARGE OF LIEUT COL G L GILLESPIE CORPS OF ENGINEERS
64
IN CHARGE OF CAPT THOS L CASEY CORPS OF ENGINEERS
83
Maurice River N J 92 Wilmington Harbor Del 93 ice harbor at New Castle
101
IN CHARGE OF CAPT WILLIAM H BIXBY CORPS OF ENGINEERS
133
IN CHARGE OF CAPT WM M BLACK CORPS OF ENGINEERS
149
HARBORLINES Establishment of harborlines of Norfolk and Portsmouth harbors
156
APPENDIX
157
ANNUAL REPORT FOR FISCAL YEAR ENDING JUNE 30 1890 3361
163
Apalachicola Bay Fla 1623
167
IN CHARGE OF MAJ A N DAMRELL Corps of ENGINEERS
171
EXAMINATIONS AND SURVEYS Warrior River Ala from Tuscaloosa to Demopolis
175
IN CHARGE OF MAJ CHAS J ALLEN CORPS OF ENGINEERS
183
PART II
184
IN CHARGE OF CAPT J H WILLARD CORPS OF ENGINEERS
195
IN CHARGE OF CAPT H S TABER Corps of EnGINEERS
201
SURVEY Osage River Mo from its mouth to the first shoal and 5 miles above
206
IMPROVEMENTS Mississippi River above the Falls of St Anthony Minn 2077
215
EXAMINATION AND SURVEY Lower Cumberland River Tenn from Nashville to
223
APPENDIX E
230
IN CHARGE OF CAPT EDW MAGUIRE CORPS OF ENGINEERS
232
IN CHARGE OF MAJ D W LOCKWOOD CORPS OF ENGINEERS
240
IN CHARGE OF MAJ JAMES B QUINN CORPS OF ENGINEERS
247
APPENDIX J
260
IN CHARGE OF CAPT W L MARSHALL CORPS OF ENGINEERS
263
APPENDIX
265
IMPROVEMENTS Potomac River at Washington D C 1037 construction of bridge
276
IN CHARGE OF COL O M POE CORPS OF ENGINEERS
278
APPENDIX M
290
IN CHARGE OF MAJ L COOPER Overman CORPS OF ENGINEERS
294
APPENDIX
298
IN CHARGE OF MAJ AMOS STICKNEY CORPS OF ENGINEERS
301
IN CHARGE OF MAJ MILTON B ADAMS CORPS OF ENGINEERS
309
APPENDIX Q
310
IN CHARGE OF MAJ W H Heuer Corps of ENGINEERS
316
EXAMINATIONS AND SURVEYS Youngs River and its tributary Klaskuine River
324
IN CHARGE OF MAJ THOMAS H HANDBURY CORPS OF ENGINEERS
329
FORTIFICATIONS
381
IMPROVEMENTS a Wharf at Fort Monroe Va 385 b Bridge over Mill Creek
387
Post of Willets Point N Y 389 Engineer School of Application 392 Battalion
421
APPENDIX
427
EXAMINATIONS AND SURVEYS Belfast Harbor Me 455 Union River and Union
475
IMPROVEMENTS Newburyport Harbor Mass 482 Merrimac River Mass 484
484
Cape Ann Mass 488 Gloucester Harbor Mass 491 Manchester Harbor Mass
493
EXAMINATIONS AND SURVEYS Crane and Waters rivers of Essex Branch Mass
517
HARBORLINES Establishment of harborlines at Boston Harbor Mass
532
APPENDIX C
551
IMPROVEMENTS Harbor of refuge at Hyannis Mass 552 harbor of refuge at Nan
558
EXAMINATIONS AND SURVEYS Marthas Vineyard inner and outer harbor at Edgar
590
APPENDIX D
599
IMPROVEMENTS Thames River Conn 600 New London Harbor Conn 604 Con
626
646 Stamford Harbor Conn 648 Port Chester Harbor N Y 650 Echo Harbor
646
N Y 656 Greenport Harbor N Y 660 Glen Cove Harbor N Y 662 Flushing
667
EXAMINATIONS AND SURVEYS Browns Creek Sayville N Y 669 Larchmont Har
675
HARBORLINES Establishment of harborlines at Stamford Harbor Conn
682
REPORT OF LIEUT COL GEORGE L GILLESPIE CORPS OF ENGINEERS
753
EXAMINATIONS AND SURVEYS Wappingers Creek from Wappingers Falls to
761
HARBORLINES Establishment of harborlines in Hudson River from Troy to Cox
788
IMPROVEMENTS Sheepshead Bay N Y 837 Canarsie Bay N Y 839 Sumpa
852
HARBORLINES Establishment of harbor lines in front of San Diego and Coronado
856
APPENDIX
865
IMPROVEMENTS Delaware River Pa and N J 866 harbor between Philadelphia
905
APPENDIX
915
IMPROVEMENTS Maurice River N J 916 Wilmington Harbor Del 917 ice har
925
REPORT OF COL WILLIAM P CRAIGHILL CORPS OF ENGINEERS
958
EXAMINATIONS AND SURVEYS Appoquinimink Creek Del 943 Wicomico River
980
APPENDIX I
987
2580
River Commission CHAS R SUTER Lieut Col of Engineers U S A O H ERNST
IN CHARGE OF MAJ ALEXANDER MACKENZIE CORPS OF ENGINEERS
HARBORLINES Establishment of harborlines in James River from Richmond
IMPROVEMENTS San Joaquin River Stockton and Mormon sloughs Cal 2909

Other editions - View all

Common terms and phrases

Popular passages

Page 353 - That it shall be the duty of the Secretary of War to apply the money herein and hereafter appropriated for improvements of rivers and harbors, other than surveys, estimates and gaugings, in carrying on the various works, by contract or otherwise, as may be most economical and advantageous to the Government.
Page 338 - Secretary first giving the parties reasonable opportunity to be heard, to give notice to the persons or corporations owning or controlling such bridge so to alter the same as to render navigation through or under it reasonably free, easy, and unobstructed...
Page 406 - For purchase and binding of professional works of recent date, treating of military and civil engineering and kindred scientific subjects, five hundred dollars ; In all, nine thousand five hundred dollars.
Page 571 - ... vessels seeking it for refuge. The southern (the main) entrance was obstructed by a bar which stretched out from Goat Island, and the general business wharves of the city could not be reached at low tide by vessels drawing more than 8 feet.
Page 338 - If the persons, corporation, or association owning or controlling any railroad or other bridge shall, after receiving notice to that effect, as hereinbefore required, from the Secretary of War, and within the time prescribed by him...
Page 624 - The existing project, on which work was in progress at the beginning of the fiscal year, was completed, without modification, in October, 1911.
Page 690 - That where it is made manifest to the Secretary of War that the establishment of harbor lines is essential to the preservation and protection of harbors he may, and is hereby, authorized to cause such lines to be established, beyond which no piers, wharves, bulkheads, or other works shall be extended or deposits made, except under such regulations as may be prescribed from time to time by him...
Page 592 - Judith is in the collection district of Newport, -which is a port of entry. The amount of revenue collected at Newport in the last calendar year was $3,408.83.
Page 301 - The earliest project for the improvement of this harbor was adopted in 1836, the date of the first appropriation, and proposed the construction of an east and west breakwater approaching to within 200 feet of each other, and connecting' at the opening with two parallel piers extending into the lake.
Page 282 - Beach was adopted in 1873, and consisted of a breakwater constructed of timber cribs, filled with stone, inclosing an area which is to be deepened by dredging where necessary. The estimate of the probable cost of the improvement was $1,442,500. The sum of...

Bibliographic information