| Administrative law - 1987 - 632 pages
...positive profit incentive to control the cost of materials or to manage his labor force effectively. This type of contract may be used in the procurement...(iv) work to be performed in emergency situations. 216.603 Letter contracts. 216.603-2 Application. (c) Letter contracts shall be specifically negotiated... | |
| Administrative law - 1980 - 750 pages
...essential that this type of contract be used only where provision is made for adequate controls, including appropriate surveillance by Government personnel during...be used in the procurement of (i) engineering and NASA PROCUREMENT REGULATION 3.406-1 416 PROCUREMENT BY NEGOTIATION design services in connection with... | |
| Administrative law - 1964 - 1202 pages
...essential that this type of contract be used only where provision is made for adequate controls, including appropriate surveillance by Government personnel during...type of contract may be used in the procurement of (1) engineering and design services in connection with the production of property ; (2) the engineering,... | |
| Administrative law - 1972 - 684 pages
...personnel during performance, to give reasonable assurChapter 1 — Federal Procurement Regulations anee that Inefficient or wasteful methods are not being...type of contract may be used In the procurement of (1) engineering and design services in connection with the production of supplies; (2) the engineering,... | |
| United States. Congress. House. Committee on Armed Services - 1960 - 802 pages
...essential that this type of contract be used only where provision is made for adequate controls, including appropriate surveillance by Government personnel during...inefficient or wasteful methods are not being used. At times this type of contract is necessary for repair, maintenance or overhaul work or work to be... | |
| United States. Congress. House. Committee on Armed Services - Defense contracts - 1960 - 774 pages
...essential that this type of contract be used only where provision is made for adequate controls, including appropriate surveillance by Government personnel during...inefficient or wasteful methods are not being used. At times this type of contract is necessary for repair, maintenance or overhaul work or work to be... | |
| United States. Department of the Army - Defense contracts - 1961 - 464 pages
...to be performed in emergency situations. Its use requires provision for adequate controls, including appropriate surveillance by Government personnel during...inefficient or wasteful methods are not being used. A variant of this type of contract which may be used under the same circumstances is the labor-hour... | |
| Aeroplane industry and trade - 1963 - 250 pages
...satisfied that there is adequate provision for appropriate surveillance by prime contractor and/or Government personnel during performance to give reasonable...inefficient or wasteful methods are not being used. The reasonableness of the estimated subcontract cost is appraised on the basis of the currency and... | |
| Aeroplane industry and trade - 1963 - 250 pages
...satisfied that there is adequate provision for appropriate surveillance by prime contractor and/or Government personnel during performance to give reasonable...inefficient or wasteful methods are not being used. The reasonableness of the estimated subcontract cost is appraised on the basis of the currency and... | |
| United States. Congress. House. Government Operations - 1965 - 134 pages
...the determination of costs applicable to the contract and (2) there is adequate provision for review by Government personnel during performance to give...inefficient or wasteful methods are not being used. The cost-reimbursement type contract may be used only after a determination, in accordance with section... | |
| |