Proceedings of the Annual Convention of the American Railway Engineering and Maintenance-of-Way Association, Volume 23The Association, 1922 - Railroads List of members in v. 1- |
From inside the book
Results 1-5 of 100
Page 26
... given . Analysis . ( f ) An analysis of the most important elements of the subject- matter should be given . Argument . ( g ) The advantages and disadvantages of the present and recom mended practices should be set forth . Illustrations ...
... given . Analysis . ( f ) An analysis of the most important elements of the subject- matter should be given . Argument . ( g ) The advantages and disadvantages of the present and recom mended practices should be set forth . Illustrations ...
Page 72
... given as much weight as warehouses included under the third classification . The range of values for warehouses with moderately rapid turnover is from 2.7 per cent to 5.2 per cent , with an average of 3.8 per cent . However , warehouse ...
... given as much weight as warehouses included under the third classification . The range of values for warehouses with moderately rapid turnover is from 2.7 per cent to 5.2 per cent , with an average of 3.8 per cent . However , warehouse ...
Page 83
... given instance , they are a guide as to the grades which will probably be required under given conditions and , if installed , can readily be altered , as may be necessary to meet the exact conditions of any given climate or traffic ...
... given instance , they are a guide as to the grades which will probably be required under given conditions and , if installed , can readily be altered , as may be necessary to meet the exact conditions of any given climate or traffic ...
Page 85
... given in the conclusions . ( 3 ) Water Power In Appendix B the Committee reports on the subject of Water Power for electric railway operation and its recommendations are given under the conclusions . ( 4 ) Electrolysis In Appendix C the ...
... given in the conclusions . ( 3 ) Water Power In Appendix B the Committee reports on the subject of Water Power for electric railway operation and its recommendations are given under the conclusions . ( 4 ) Electrolysis In Appendix C the ...
Page 86
... given under the conclusions . ( 8 ) Collaboration with Committee XVI - Economics of Railway Location In Appendix G the Committee reports the result of its collaboration with Committee XVI on the economics of railway location as affected ...
... given under the conclusions . ( 8 ) Collaboration with Committee XVI - Economics of Railway Location In Appendix G the Committee reports the result of its collaboration with Committee XVI on the economics of railway location as affected ...
Contents
131 | |
159 | |
164 | |
165 | |
166 | |
167 | |
168 | |
225 | |
232 | |
263 | |
393 | |
427 | |
447 | |
483 | |
490 | |
784 | |
899 | |
18 | |
23 | |
28 | |
44 | |
59 | |
72 | |
86 | |
91 | |
99 | |
106 | |
177 | |
187 | |
Other editions - View all
Common terms and phrases
American Railway Association American Railway Engineering Appendix ash pit average ballast boiler bolts bridges capacity cars Cast Iron cent Chairman circuits classification yard Cleaning Clearance Committee recommends concrete connection construction Contractor cost crane crossing diameter double track Electric Electrolysis elevator engine house equipment feet fire floor freight house gang Grooved handling Illinois Central Railroad inch inspection installed length load located locomotive Manual material Maximum metal method Mikado miles Minimum motor operation paint passenger pipe plans plates platform rail railroad Railway Age Railway Engineering Association repair road Shawinigan Falls shifts-Total side space specifications spikes standard Steam steel storage Sub-Committee submitted surface swing bridges switches terminal tion Total traffic trains transfer table Transverse Fissures Trolley trucks valve vertical lift bridges wall Wallace warehouse weight width wire Wood yard
Popular passages
Page 550 - The manufacturer shall afford the inspector, without charge, all reasonable facilities to satisfy him that the material is being furnished in accordance with these specifications. All tests and inspection shall be made at the place of manufacture prior to shipment, unless otherwise specified, and shall be so conducted as not to interfere unnecessarily with the operation of the works.
Page 505 - The purchaser may make the tests to govern the acceptance or rejection of the material in his own laboratory or elsewhere. Such tests, however, shall be made at the expense of the purchaser.
Page 43 - Be it further Resolved, That this resolution be spread upon the minutes of this meeting and that certified copies be sent to Hon.
Page 541 - The provisions of this agreement shall Inure to the benefit of and be binding upon the successors and assigns of the parties.
Page 1116 - Howard said he desired to call the attention of the members of the Association to the fact that this was the most representative meeting of the Association ever held.
Page 520 - For smaller sizes of pipes the letters may be 1 inch in length. The weight and the class letter shall be conspicuously painted in white on the inside of each pipe and special casting after the coating has become hard. ALLOWABLE PERCENTAGE OF VARIATION IN WEIGHT. SECTION 7. No pipe shall be accepted the weight of which shall be less than the standard...
Page 479 - Fine aggregate shall consist of sand, stone screenings, or other inert materials with similar characteristics, or a combination thereof, having clean, hard, strong, durable, uncoated grains and free from injurious amounts of dust, lumps, soft or flaky particles, shale, alkali organic matter, loam or other deleterious substances.
Page 126 - ... to that test. If either of these two additional specimens fails, the lot of tape represented by that sample shall be rejected. NOMINAL MINIMUM MINIMUM WEIGHT NET WEIGHT LENGTH PER ROLL, PER 100 PER POUND, LB. ROLLS, LB.
Page 524 - Specimen bars of the metal used, each being 26 inches long by 2 inches wide and i inch thick, shall be made without charge as often as the engineer may direct, and, in default of definite instructions, the contractor shall make and test at least one bar from each heat or run of metal. The bars, when placed flatwise upon supports 24 inches apart and loaded in the...
Page 519 - All pipes having the same outside diameter shall have the same inside diameter at both ends. The inside diameter of the lighter pipes of each standard outside diameter shall be gradually increased for a distance of about 6 inches from each...