Time distribution based on ten 100-lb. rails laid with six-hole plain bars replacing rail of lighter weight, fully tie plated and applying new tie plates out of face. (Typical figures shown in parenthesis.)

[blocks in formation]

Distributing bolts, nut locks, spikes, and tie plates.

[blocks in formation]

60)

(40)

(50)

(154)

(

18)

(100)

(90)

(

54)

[blocks in formation]

Standard schedule in hours per 33-ft. rail.

To be considered as 100 per cent efficiency.

MAKING CONNECTIONS

Add to the standard hours computed for laying rail, additional hours for making connections as follows:

For each connection made, add (one) per cent of the total hours on rail laying reported for the day's work.

EXAMPLE

A gang of 45 men laid 160, 33-ft. rails in a ten-hour day and made four connections. A 10 per cent allowance is made for detention on account of going to and from work and getting out of the way of passing trains.

[blocks in formation]

SPECIFICATIONS FOR THE BALLASTING OF TRACK BY CONTRACT

(1) The railway company's authorized representative shall arrive at a clear understanding with the contractor as to the force to be employed, the speed with which it is desired to have the work proceed, the source of ballast supply and the general traffic situation in the territory to be ballasted, in order that proper plans may be made to proceed economically

with the work specified. Prior to starting the work the contractor shall notify the railway company's representative a sufficient time in advance so that speed and traffic restrictions in the territory in which the work is to be performed may be arranged with the operating department of the railway company.

(2) The railway company will provide the necessary inspector or inspectors, and the instructions of such inspectors regarding the quality and type of work to be done shall be complied with at all times by the contractor.

(3) The contractor shall supply the necessary foremen and labor to prosecute the work properly and in such numbers as may be required by the Chief Engineer or his authorized representative, and at the request of the Chief Engineer or his representative will remove any foreman or man employed not satisfactory to the railway company.

(4) The railway company shall provide and the contractor shall pay for competent flagmen during the continuance of this work, to flag in accordance with the rules of the company for the protection of the work and traffic.

(5) Where required, banks shall be widened to the proper width prior to starting ballast work and a sufficient time in advance so that there will be no interference. Such widening of embankments and the proper grading of public or private crossings shall be done by the railway company unless specific instructions are given by the representatives of the railway company to the contractor to do such work.

(Note. If contractor is to do bank widening work, specifications for such work must be provided.)

(6) Grade stakes will be set to the proper grade by the representative of the railway company before the ballast material has been dumped and spread.

(7) All tile, box or other drains required to take care of water between the tracks shall be placed before the ballast material is unloaded.

(8) The railway company will supply all equipment and train crews required for the loading, transporting, unloading and spreading of the ballast. The contractor shall supply all tools needed in connection with this work.

(9) The railway company shall furnish all ballast as required in its own cars and shall transport and switch such ballast free of cost to the contractor to the point where it is to be applied.

(10) Ballast shall be unloaded by the contractor by dumping or plowing as the means provided by the railway company permit. If the ballast is in center dump cars it shall be unloaded by having one or more cars opened at a time, allowing the required amount of ballast material to flow out as the train is moved along slowly. If the material is on flat or open cars, it shall be plowed off by means of an unloading machine while the train is moving at such a rate of speed as to provide the desired amount of material as uniformly distributed as possible. The unloaded material shall be leveled down by means of a ballast plow or

spreader. Care shall be taken not to destroy or disturb the grade stakes. (11) The preliminary surfacing gang shall follow the unloading as closely as the regularity of the ballast supply will permit. In using jacks, they must be placed close enough together to prevent undue bending of the rail or strain on the joints. Both rails must be raised at one time and as nearly uniformly as possible. The track shall be so lifted that after a period of not less than three days after the last lift it will be necessary to give it a final lift of not less than one inch nor more than two inches to bring it to the grade of the stakes. All ties that are pulled loose or renewed shall be replaced to proper position and must have a bearing against the rail and be fully spiked, with all spikes driven home before tamping. In driving spikes, all spikes shall be started vertically and square with the rail, and so driven that the base of the spikes shall have a full hold on the rail. Spikes must not be straightened while being driven. Ballast shall be well packed or tamped with pick, shovel, tamping bar or tamping machine, as directed, from a point fifteen inches inside of each rail on both sides of the ties to the end of the ties, tamping the outside of the tie first.

(12) When the track has been raised to within one or two inches of the final grade and properly compacted by traffic, a finishing lift shall be made by jacking up the track to the exact height provided for by the grade stakes. All allowance for settlement shall be taken care of in the setting of the stakes and the necessary ballast forked or shoveled in, and then driven to place by tamping machines, tamping picks, bars or shovels, as directed by the proper representative of the railway company. In making the finishing lift the spot board and level board must be used with care and the track brought to as true a surface as possible.

(13) The track shall be placed in good alinement before the finishing lift is made, but a lining gang shall follow one or two days behind the finishing lift and shall spot up all places found not to be holding up to proper surface, and shall line the track to as accurate an alinement as possible. Center stakes shall be set for the alinement before the finishing lift is made and the final alinement must conform to the center stakes.

(14) The contractor shall trim the ballast to conform to the standard roadbed section, and the railway company for this purpose shall supply its standard cross-section template. The portion of the sub-grade outside the ballast line shall be left with a full even surface and the shoulder of the embankment properly dressed to the standard roadbed section. The contractor shall dispose of any surplus ballast after trimming the ballast section as directed by the representative of the railway company.

(15) The contractor must restore and secure promptly all stockguards, crossing plank, or other facilities displaced by reason of the ballasting.

(16) After ten days' use of the track by the railway company the contractor shall go over same and surface and line low joints and spots which may have developed without extra charge to the railway company.

(17) The contractor shall remove from the railway company's property all rubbish and waste from any ballast work, or dispose of it as directed by the representative o. the railway company. After completing the work the contractor shall remove from the railway company's property, and from all public and privately-owned property, at his own expense all temporary structures and waste resulting from his camping operations.

(18) In measuring the work, lining, surfacing and trimming turnouts and crossovers shall be considered as main track.

(19) The contractor is to understand that any work not specifically mentioned in the specifications, but which is necessary, either directly or indirectly, for the proper carrying out of the intent thereof, shall be required and applied, and he shall perform all such work just as if it were particularly delineated or described. Unless specifically mentioned above, all work shall conform to the standards of the railway company.

UNIT TRACK WORK SCHEDULE FOR BALLASTING

Where

Suggested form for unit track work schedules for ballasting. track is at present ballasted with cinders, granulated slag, or gravel, and is to be renewed with stone ballast, track to be given two raises on stone, tamped with forks, and given a final out-of-face surfacing with picks. Track to be dressed to standard stone ballast section and to have 12 inches of ballast under the ties.

Separate schedules to be used for stripping track, respacing ties and renewing ties, which work is to be done ahead of the unloading of stone ballast.

The second dumping of ballast to be heavy enough so that after the second raise the cribs will be only about one-half full. This will allow the final surfacing (with tamping picks) to be done with the minimum amount of labor for cribbing out ballast, and will leave sufficient ballast around the ties to keep them in place until the ballast is dumped for dressing. (Typical figures shown in parenthesis.)

[blocks in formation]
[blocks in formation]

Total minutes per foot of track..

Standard schedule in hours per foot of one track.

EXAMPLE

29.85 0.497

A gang of 90 men complete 1,676 ft. of track in a ten-hour day and is allowed a 10 per cent detention for going to and from work and getting out of the way of passing trains.

Total standard hours 1676 X .497732.97.

Total hours made...

Total hours detention..

Total actual hours ballasting......

Efficiency = 732.97 +810=90.4 per cent.

900

90

810

SPECIFICATIONS FOR THE STRIPPING OF TRACK, THE RENEWAL OF TIES AND THE RESPACING OF TIES

(1) The railway company's authorized representative shall arrive at a clear understanding with the contractor as to the force to be employed, the speed with which it is desired to have the work proceed, the source of ballast supply and the general traffic situation in the territory in question, in order that proper plans may be made to proceed economically with the work specified. Prior to starting the work the contractor shall notify the railway company's representative a sufficient time in advance so that speed and traffic restrictions in the territory in which the work is