Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building and inside the walls, and arranged to cut off the entire current from the building. Science and Industry - Page 2581902Full view - About this book
| American Institute of Electrical Engineers - Electric engineering - 1897 - 710 pages
...construction, Nos. 44. and 43.) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the switch required by Rule No. 22 is inside the building, the cut-out required by this section... | |
| American Society of Mechanical Engineers - Mechanical engineering - 1898 - 1122 pages
...No». 44 and 45.) a. Must be placed on all service wires, either overhead or under" ground, as near as possible to the point where they enter the building and inside the walls, and be arranged to cut off the entire current from the building. Where the switch required by Rule No.... | |
| Horatio Alvah Foster - Electrical engineering - 1901 - 1018 pages
...construction Nos. 52 and 53.) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building and inside the walls, and arranged to cut oil the entire current from the building. "Where the switch required by rule No. 22 is inside the building,... | |
| Francis Bacon Crocker - Electric lighting - 1901 - 528 pages
...each of all service wires as near as possible to the point where they enter the building, on inside of the walls, and arranged to cut off the entire current from the building. The wires then run to the service switch, which should be capable of opening the circuit when carrying... | |
| Agriculture - 1902 - 738 pages
...and Circuit-Breakers) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the required switch is inside the building, the cutout required by this section must be placed... | |
| George Velten Steeb - Fire insurance - 1902 - 230 pages
...cut-outs, fuses, or circuit-breakers on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building, must be placed at every point where a change is made in the size of the wire, unless the cut-out in... | |
| Harry Cooke Cushing - Electric wiring - 1902 - 204 pages
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected... | |
| American School (Lansing, Ill.) - Electricity - 1903 - 320 pages
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected... | |
| Electrical engineering - 1905 - 484 pages
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected... | |
| Electric lighting - 1906 - 544 pages
...are also provided. a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the required switch is inside the building, the cutout required by this section must be placed... | |
| |