" Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building and inside the walls, and arranged to cut off the entire current from the building. "
Science and Industry - Page 258
1902
Full view - About this book

Transactions of the American Institute of Electrical Engineers

American Institute of Electrical Engineers - Electric engineering - 1897 - 710 pages
...construction, Nos. 44. and 43.) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the switch required by Rule No. 22 is inside the building, the cut-out required by this section...
Full view - About this book

Transactions of the American Society of Mechanical Engineers, Volume 19

American Society of Mechanical Engineers - Mechanical engineering - 1898 - 1122 pages
...No». 44 and 45.) a. Must be placed on all service wires, either overhead or under" ground, as near as possible to the point where they enter the building and inside the walls, and be arranged to cut off the entire current from the building. Where the switch required by Rule No....
Full view - About this book

Electrical Engineer's Pocket-book: A Hand-book of Useful Data for ...

Horatio Alvah Foster - Electrical engineering - 1901 - 1018 pages
...construction Nos. 52 and 53.) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building and inside the walls, and arranged to cut oil the entire current from the building. "Where the switch required by rule No. 22 is inside the building,...
Full view - About this book

Distributing system and lamps

Francis Bacon Crocker - Electric lighting - 1901 - 528 pages
...each of all service wires as near as possible to the point where they enter the building, on inside of the walls, and arranged to cut off the entire current from the building. The wires then run to the service switch, which should be capable of opening the circuit when carrying...
Full view - About this book

International Library of Technology: A Series of Textbooks for ..., Volume 13

Agriculture - 1902 - 738 pages
...and Circuit-Breakers) a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the required switch is inside the building, the cutout required by this section must be placed...
Full view - About this book

Agents' and Inspectators Pocket-book of Fire Protection

George Velten Steeb - Fire insurance - 1902 - 230 pages
...cut-outs, fuses, or circuit-breakers on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building, must be placed at every point where a change is made in the size of the wire, unless the cut-out in...
Full view - About this book

Standard Wiring for Electric Light and Power: As Adopted by the Fire ...

Harry Cooke Cushing - Electric wiring - 1902 - 204 pages
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected...
Full view - About this book

Practical Lessons in Electricity. Elements of Electricity. The Electric Current

American School (Lansing, Ill.) - Electricity - 1903 - 320 pages
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected...
Full view - About this book

Cyclopedia of Applied Electricity: Current measurements; Wiring; Telegraph

Electrical engineering - 1905 - 484 pages
...all service wires as near as possible to the point where they enter the building, on the inside of the walls, and arranged to cut off the entire current from the building. The cut-out or circuit breaker should always be the first thing that the service wires are connected...
Full view - About this book

Storage Batteries ; Incandescent Lighting ; Arc Lighting ; Interior Wiring

Electric lighting - 1906 - 544 pages
...are also provided. a. Must be placed on all service wires, either overhead or underground, as near as possible to the point where they enter the building...arranged to cut off the entire current from the building. Where the required switch is inside the building, the cutout required by this section must be placed...
Full view - About this book