Search Images Maps Play YouTube News Gmail Drive More »
Sign in
Books Books
" The long-term monitoring plan consists of locating ground-water monitoring wells and developing a ground-water sampling and analysis strategy. This plan is used to monitor plume migration over time and to verify that natural attenuation is occurring at... "
Proceedings of the Symposium on Natural Attenuation of Chlorinated Organics ... - Page 58
1996
Full view - About this book

Natural Attenuation of Fuels and Chlorinated Solvents in the Subsurface

Todd H. Wiedemeier, Hanadi S. Rifai, Charles J. Newell, John T. Wilson - Technology & Engineering - 1999 - 634 pages
...changes in the groundwater flow pattem. Designing an effective groundwater monitoring plan involves locating groundwater monitoring wells and developing a groundwater sampling and analysis strategy. Long-term monitoring and contingency plant are site specific. Because of this, all available site-specific...
Limited preview - About this book

Natural Attenuation of Hazardous Wastes

Rao Y. Surampalli, Say Kee Ong, Eric Seagren, Julio Nuno, Shankha Banerji - Technology & Engineering - 2004 - 256 pages
...1995). 4.2 MonItoring Wells Developing long-term monitoring include: siting monitoring wells to evaluate plume migration over time and to verify that natural attenuation is occurring to protect the health and environment of the down-gradient receptors. Design of monitoring wells should...
Limited preview - About this book

Symposium on Natural Attenuation of Ground Water

Groundwater - 1994 - 151 pages
...exposure assessment allows the proponent to show that potential exposure pathways will not be completed. The long-term monitoring plan consists of locating...monitor plume migration over time and to verify that intrinsic remediation is occurring at rates sufficient to protect potential downgradient receptors....
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search