Alabama Power Co Anderson County application Asheville believe Big Creek power BROWN build capacity CHAIRMAN Chattanooga Clinch River committee Congress construction corporation cost County course Cove Creek Dam Creek power house DAVIS East Tennessee Development engineer Federal Power Commission Federal water power feet flow gentlemen GILBERT going Government Grainger County granted hearing horsepower hydroelectric kilowatts Knoxville KRUESI Lenoir City license Loudon County Major FISKE MARTIN matter ment MERRILL Muscle Shoals navigation necessary nessee North Carolina operation permittee Pigeon River Power possible power at Muscle power companies power development preliminary permit present primary power proposition question rates resolution Senator HEFLIN Senator KENDRICK Senator MCKELLAR Senator Norris Senator RANSDELL Senator TYSON Shaver Lake statement steam plant storage dam stream survey SWITZER Tenn Tennessee Electric Power Tennessee River thing tion tributaries understand United water power act water-power developments
Popular passages
Page 73 - That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of waterpower development, and for other beneficial public uses...
Page 73 - That whenever any licensee hereunder is directly benefited by the construction work of another licensee, a permittee, or of the United States of a storage reservoir or other headwater improvement, the Commission shall require as a condition of the license that the licensee so benefited shall reimburse the owner of such reservoir or other improvements for such part of the annual charges for interest, maintenance, and depreciation thereon as the Commission may deern equitable. The proportion of such...
Page 2 - State or municipality, for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation, and for the development, transmission, and utilization of power...
Page 60 - States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of War.
Page 63 - Such maps, plans, specifications, and estimates of cost as may be required for a full understanding of the proposed project. Such maps, plans, and specifications when approved by the commission shall be made a part of the license; and thereafter no change shall be made in said maps, plans, or specifications until such changes shall have been approved and made a part of such license by the commission.
Page 63 - ... aiding flood control, reclamation, and similar developments. D. Whether proper provision is made for present or future electrical interconnection with other projects or systems in order to take advantage of diversity of stream flow and of power demands. E. Whether the...
Page 2 - Is authorized and empowered, inter alia, to issue licenses for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development, transmission, and utilization of power across, along, from, or in any of the navigable waters of the United States...
Page 63 - The permittee shall keep accurate and sufficient record of the foregoing determinations to the satisfaction of the Commission, shall make return of such records at the time of filing application for license and at such other times as the Commission may require, and in such form as the Commission may prescribe.
Page 64 - That all licenses issued under this Act shall be on the following conditions: (a) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the commission will be best adapted to a comprehensive scheme of improvement and utilization for the purposes of navigation, of water-power development, and of other beneficial public uses...
Page 2 - Washington, DC The committee met, pursuant to call, at 10.30 o'clock am, in room 326, Senate Office Building, Senator George W.