Proceedings of the ... Annual Convention of the American Railway Engineering Association, Volume 16Committee on Publications of the Association, 1915 - Railroad engineering List of members in v. 1-10. |
From inside the book
Results 1-5 of 53
Page 19
... cent ; fat 6.08 per cent ; fiber 7.29 per cent ; nitrogen - free extract 37.89 per cent ; water 9.60 per cent ; ash 5.27 per cent . New Process Meal . - Protein 32.20 per cent ; fat 3.00 per cent ; fiber 9.50 per cent ; nitrogen - free ...
... cent ; fat 6.08 per cent ; fiber 7.29 per cent ; nitrogen - free extract 37.89 per cent ; water 9.60 per cent ; ash 5.27 per cent . New Process Meal . - Protein 32.20 per cent ; fat 3.00 per cent ; fiber 9.50 per cent ; nitrogen - free ...
Page 18
... Cent Cent Cent Cent Cent Per Per Per Per Per Per Per Per Per Per Per Cent Cent Cent Cent Cent Cent 6-18 Tobacco Fertilizer2 . Marshfield Supply Company , Marshfield 1.65 1.70 90.00 14.35 10-50 Two - in - One Fertilizer . Tom Bueneman ...
... Cent Cent Cent Cent Cent Per Per Per Per Per Per Per Per Per Per Per Cent Cent Cent Cent Cent Cent 6-18 Tobacco Fertilizer2 . Marshfield Supply Company , Marshfield 1.65 1.70 90.00 14.35 10-50 Two - in - One Fertilizer . Tom Bueneman ...
Page 16
... cent more than the mean for the 19 years ; 139 per cent more than in 1923 , the min- imum year for the period , and 50 per cent above the previous high means for the period in 1916 and 1920. At Bethlehem on the Lehigh River , the mean ...
... cent more than the mean for the 19 years ; 139 per cent more than in 1923 , the min- imum year for the period , and 50 per cent above the previous high means for the period in 1916 and 1920. At Bethlehem on the Lehigh River , the mean ...
Page 52
... cent . The super- heaters are located between the first and second banks of tubes . Superheat added at 100 per cent rat- ing , 222 deg . F .; at 200 per cent rating , 265 deg .; at 300 per cent rating , 280 deg . Final steam tempera ...
... cent . The super- heaters are located between the first and second banks of tubes . Superheat added at 100 per cent rat- ing , 222 deg . F .; at 200 per cent rating , 265 deg .; at 300 per cent rating , 280 deg . Final steam tempera ...
Page 4255
... cent and earned 9.54 per cent . The New York Central paid 5.44 per cent and earned 11.08 per cent . The effect of the 5 per cent increase now under consideration upon the ratio of net corporate income to capital stock is as follows ...
... cent and earned 9.54 per cent . The New York Central paid 5.44 per cent and earned 11.08 per cent . The effect of the 5 per cent increase now under consideration upon the ratio of net corporate income to capital stock is as follows ...
Contents
75 | |
87 | |
92 | |
103 | |
151 | |
158 | |
433 | |
441 | |
521 | |
543 | |
565 | |
602 | |
611 | |
612 | |
624 | |
630 | |
636 | |
655 | |
668 | |
675 | |
681 | |
699 | |
706 | |
715 | |
728 | |
739 | |
746 | |
785 | |
791 | |
793 | |
825 | |
867 | |
884 | |
891 | |
1023 | |
1037 | |
1047 | |
1071 | |
1085 | |
1093 | |
1117 | |
1133 | |
1147 | |
1153 | |
1159 | |
1173 | |
1179 | |
1183 | |
4 | |
8 | |
13 | |
19 | |
28 | |
47 | |
51 | |
151 | |
205 | |
225 | |
245 | |
255 | |
271 | |
279 | |
299 | |
301 | |
iv | |
xiv | |
Other editions - View all
Common terms and phrases
85 ASCE 90 ASCE American Railway Association American Railway Engineering ARA-B Average Baltimore & Ohio base Bessemer Rail Board of Direction bolts bridges Cambria carbon Carnegie cars cent Chicago Chief Eng coal coal tar coat Committee concrete Contractor cost creosote Cross curve deflection drop test elongation fence finishing flange freight gage grade graphite Guard timbers head Illinois inches information No information ingot Lackawanna lag screws Lake Erie lamp black Lehigh Valley length Lines East linseed oil load locomotives maintenance Manual material metal method Mile mills Norfolk & Western Open Hearth Rail Open-Hearth paint Penna piles Pine plates posts Railroad Railway Engineering Association recommended red lead Roller rolling ruling gradient showing specifications steam steel Sub-Committee surface Table temperature tensile tensile strength tion Tons Total Failures tracheids track train White lead wire wood Yard Yes Yes yield point
Popular passages
Page 95 - If at any time there shall be evidence of any lien or claim for which, if established, the Owner of the said premises might become liable, and which is chargeable to the Contractor, the Owner shall have the right to retain out of any payment then due or thereafter to become due an amount sufficient to completely indemnify him against such lien or claim.
Page 100 - This agreement shall inure to the benefit of and be binding upon the legal representatives and successors of the parties respectively.
Page 1147 - THE PRESIDENT: We will now take up the report of the Committee on Meters, Mr.
Page 908 - ... either red or black, and is so fixed by growth or position that it will retain its place in the piece.
Page 944 - ... long or a carriage bolt not less than 4 ii. x3-8 in. except that when the arms are so spaced that the braces cannot be attached to the poles in this manner, they shall be fastened vertically to the arms at points situated two-thirds of the distance from the center of the pole to the end of the arm, and in addition a pair of braces shall be attached in the usual manner to the bottom arm and the pole.
Page 406 - All tests and inspection shall be made at the place of manufacture prior to shipment, and shall be so conducted as not to interfere unnecessarily with the operation of the works.
Page 98 - Company does not give notice in writing to the Contractor to resume work at a date within of the date fixed in the written notice to suspend, then the Contractor may abandon that portion of the work so suspended and he will be entitled to the estimates and payments for work done, on such portion so abandoned, as provided in Section 38 of this contract Expediting Work, Correcting Imperfections.
Page 28 - Hadley is a member of the American Railway Engineering Association and the American Society of Civil Engineers.
Page 173 - ... such viaduct and its approaches. The proceedings for such purpose shall be the same as provided herein for the purpose of determining damages to property owners by reason of the...
Page 97 - If the Contractor shall be delayed in the performance of the work from any cause for which the Company is responsible, he shall, upon written application to the Chief Engineer at the time of such delay, be granted such extension of time as the Chief Engineer shall deem equitable and just. Suspension of Work. 32. The Company may at any time stop the work, or any part thereof, by giving ten (10) days' notice to the Contractor in writing.