abutments acres agreed agreement amount Assistant Engineer ballast Baltimore & Ohio bank BARREL PER LINEAL bridges Canadian Pacific Railway cause cent Central Railroad Chattanooga & St Chicago Chief Engineer Committee construction contract Contractor corporation cost damage ditches Division Engineer drain drainage area embankment Engineer Maintenance Erie Railroad estimate expense FEET CULVERT fence FILL IN LENGTH flood formula grade crossings highway Illinois Central Railroad Lehigh Valley Railroad LINEAL FT Louis Railway masonry material METAL Michigan Central Railroad miles Missouri Missouri Pacific Railway necessary Ohio Railroad opening Pacific Railway paid parties hereto payment piles pipe plates proper rail Railroad Company Railway Company Recommended Clause reinforced concrete riprap River road roadbed rock screw-spike side sinkholes slides slope snow specifications spikes square miles stream street structure surface thereof timber tion track tractor trestle viaduct washout waterway wood
Popular passages
Page 1234 - Should the Contractor at any time refuse or neglect to supply a sufficiency of properly skilled workmen, or of materials of the proper quality, or fail in any respect to prosecute the work wIth promptness and diligence, or fail in the performance of any of the agreements herein contained, such refusal, neglect or failure being certified by the Architects, the Owner shall be at liberty, after three days...
Page 956 - ... if the two corporations cannot agree upon the amount of compensation to be made therefor, or the points and manner of such crossings and connections...
Page 1198 - It is also understood and agreed by and between the parties hereto, that such additional drawings and explanations as may be necessary to detail and illustrate the work to be done are to be furnished by...
Page 1267 - Should there prove to be any such claim after all payments are made, the Contractor shall refund to the Owner all moneys that the latter may be compelled to pay in discharging any lien on said premises made obligatory in consequence of the Contractor's default.
Page 1251 - IX. It is hereby mutually agreed between the parties hereto that the sum to be paid by the Owner., to the Contractor., for said work and materials shall be...
Page 1207 - ... make void the contract, but will be added to or deducted from the amount of the contract, as the case may be, by a fair and reasonable valuation.
Page 1335 - Chemical determinations of the percentages of carbon, phosphorus, sulphur and manganese shall be made by the manufacturer from a test ingot taken at the time of the pouring of each melt of steel, and a correct copy of such analysis shall be furnished to the engineer or his inspector. Check analyses shall be made from finished material, if called for by the purchaser, in which case an excess of 25 per cent. above the required limits will be allowed.
Page 1184 - Association, of the second part, witnesseth, that for and In consideration of the covenants and payments hereinafter mentioned, to be made and performed by the said
Page 1213 - Architect shall by like written notice condemn as unsound or improper, or as in any way failing to conform to the drawings and specifications, and shall make good all work damaged or destroyed thereby.
Page 956 - And every company whose railroad is or shall be hereafter intersected by any new railroad, shall unite with the owners of such new railroad in forming such intersections and connections, and grant the facilities aforesaid...